{"id":1940,"date":"2018-05-11T16:21:49","date_gmt":"2018-05-11T14:21:49","guid":{"rendered":"http:\/\/upon.wmp.mx\/?p=1940"},"modified":"2018-10-17T19:44:57","modified_gmt":"2018-10-17T17:44:57","slug":"electromobility-in-mexico-part-3-charging-infrastructure","status":"publish","type":"post","link":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/","title":{"rendered":"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure"},"content":{"rendered":"<p><em>What about electromobility in Mexico? Does it exist? The third part of the blog provides an overview of the charging infrastructure.<\/em><\/p>\n<p>The infrastructure is given, now only an increased demand for e-cars is missing. Comparatively many charging stations already exist, especially in and around the capital region. Tesla and ChargeNow, the two major suppliers, are currently coming together at over 850 stations throughout Mexico.<\/p>\n<p><strong>ChargeNow<\/strong><\/p>\n<p>The car manufacturers BMW and Nissan as well as other partners operate the charging network <a href=\"http:\/\/www.chargenow.mx\/\">ChargeNow<\/a>. Furthermore, the national power company <a href=\"https:\/\/www.cfe.mx\/Pages\/Index.aspx\">CFE<\/a> (Comision Federal de Electricidad) for example is among the partners. The network is currently mostly free of charge and was built by Schneider Electronic and General Electric. With around 440 stations, it is the largest network in the country.<\/p>\n<div id=\"attachment_251\" style=\"width: 1020px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-251\" class=\"wp-image-251 size-full\" src=\"\/UP1\/wp-content\/uploads\/ChargeNow-Netz.png\" alt=\"\" width=\"1010\" height=\"474\" \/><p id=\"caption-attachment-251\" class=\"wp-caption-text\">Map of ChargeNow charging stations in Mexico.<\/p><\/div>\n<p><strong>Charging stations from Tesla<\/strong><\/p>\n<p>Around 415 charging stations are operated by the car manufacturer Tesla and thus form the second largest network in Mexico. Some of the self-developed charging stations can also be used by other manufacturers.<\/p>\n<p><strong>The network of charging stations<\/strong><\/p>\n<p>Because of the comparatively high demand for e-vehicles in and around Mexico City, the charging infrastructure has a high concentration too. In addition, a study published in 2017 by <a href=\"https:\/\/www.gob.mx\/inecc\">INECC<\/a> (Instituto Nacional de Ecologia y Cambio Climatico) identified the areas with the highest demand, measured by traffic volume:<\/p>\n<ul>\n<li>Along the inner-city ring road (Circuito Interior)<\/li>\n<li>Between the city center and the business district of Santa Fe in the west<\/li>\n<li>Along the outer ring road at the southeastern section (Anillo Periferico)<\/li>\n<\/ul>\n<p>In total, Mexico City currently has over 100 charging stations, most of them located in the city center and in the western part of the city.<\/p>\n<p><strong>Preferred placements for charging stations:<br \/>\n<\/strong><\/p>\n<ul>\n<li>Shopping centers<\/li>\n<li>Hotels<\/li>\n<li>Gas stations<\/li>\n<li>Office buildings<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>For more information about electromobility in Mexico, read also part one and part two of the blog entries:<\/p>\n<p><a href=\"https:\/\/wmp.mx\/en\/blog\/electromobility-in-mexico-part-1-status-quo\/\">Electromobility in Mexico &#8211; Part 1: Status Quo<\/a><\/p>\n<p><a href=\"https:\/\/wmp.mx\/en\/blog\/electromobility-in-mexico-part-2-local-manufacturers\/\">Electromobility in Mexico &#8211; Part 2: Local manufacturers<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What about electromobility in Mexico? Does it exist? The third part of the blog provides an overview of the charging infrastructure. The infrastructure is given, now only an increased demand for e-cars is missing. Comparatively many charging stations already exist, especially in and around the capital region. Tesla and ChargeNow, the two major suppliers, are [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1944,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"mc4wp_mailchimp_campaign":[],"footnotes":""},"categories":[37,27],"tags":[],"class_list":["post-1940","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-consulting-en-2","category-news-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Electromobility in Mexico \u2013 Part 3: Charging Infrastructure - WMP Mexico Advisors<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure - WMP Mexico Advisors\" \/>\n<meta property=\"og:description\" content=\"What about electromobility in Mexico? Does it exist? The third part of the blog provides an overview of the charging infrastructure. The infrastructure is given, now only an increased demand for e-cars is missing. Comparatively many charging stations already exist, especially in and around the capital region. Tesla and ChargeNow, the two major suppliers, are [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/\" \/>\n<meta property=\"og:site_name\" content=\"WMP Mexico Advisors\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-11T14:21:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-10-17T17:44:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/wmp.mx\/UP1\/wp-content\/uploads\/electromobility.png\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"360\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"WMP Mexico Advisors\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"WMP Mexico Advisors\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/\"},\"author\":{\"name\":\"WMP Mexico Advisors\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/#\\\/schema\\\/person\\\/84796aec27fb6ce4b181b6e6dd4917a2\"},\"headline\":\"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure\",\"datePublished\":\"2018-05-11T14:21:49+00:00\",\"dateModified\":\"2018-10-17T17:44:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/\"},\"wordCount\":334,\"image\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/wmp.mx\\\/UP1\\\/wp-content\\\/uploads\\\/electromobility.png\",\"articleSection\":[\"Consulting\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/\",\"url\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/\",\"name\":\"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure - WMP Mexico Advisors\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/wmp.mx\\\/UP1\\\/wp-content\\\/uploads\\\/electromobility.png\",\"datePublished\":\"2018-05-11T14:21:49+00:00\",\"dateModified\":\"2018-10-17T17:44:57+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/#\\\/schema\\\/person\\\/84796aec27fb6ce4b181b6e6dd4917a2\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/wmp.mx\\\/UP1\\\/wp-content\\\/uploads\\\/electromobility.png\",\"contentUrl\":\"https:\\\/\\\/wmp.mx\\\/UP1\\\/wp-content\\\/uploads\\\/electromobility.png\",\"width\":\"768\",\"height\":\"360\",\"caption\":\"Electromobility in Mexico\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/en\\\/electromobility-in-mexico-part-3-charging-infrastructure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/wmp.mx\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/#website\",\"url\":\"https:\\\/\\\/wmp.mx\\\/\",\"name\":\"WMP Mexico Advisors\",\"description\":\"Queretaro | Mexiko Stadt | Puebla | Stuttgart | Greenville\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/wmp.mx\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/wmp.mx\\\/#\\\/schema\\\/person\\\/84796aec27fb6ce4b181b6e6dd4917a2\",\"name\":\"WMP Mexico Advisors\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/21f9f8c0c3185162b5e65d2092ea016646e997bb1db514746a1fa5a874a66e54?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/21f9f8c0c3185162b5e65d2092ea016646e997bb1db514746a1fa5a874a66e54?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/21f9f8c0c3185162b5e65d2092ea016646e997bb1db514746a1fa5a874a66e54?s=96&d=mm&r=g\",\"caption\":\"WMP Mexico Advisors\"},\"description\":\"WMP Mexico Advisors ist der Partner des Mittelstands in Mexiko. Unser Ziel ist, internationalen Unternehmen beim Aufbau und der Verwaltung ihrer ausl\u00e4ndischen Niederlassung in Mexiko eine Hilfestellung zu bieten.\",\"sameAs\":[\"https:\\\/\\\/wmp.mx\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure - WMP Mexico Advisors","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/","og_locale":"en_US","og_type":"article","og_title":"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure - WMP Mexico Advisors","og_description":"What about electromobility in Mexico? Does it exist? The third part of the blog provides an overview of the charging infrastructure. The infrastructure is given, now only an increased demand for e-cars is missing. Comparatively many charging stations already exist, especially in and around the capital region. Tesla and ChargeNow, the two major suppliers, are [&hellip;]","og_url":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/","og_site_name":"WMP Mexico Advisors","article_published_time":"2018-05-11T14:21:49+00:00","article_modified_time":"2018-10-17T17:44:57+00:00","og_image":[{"width":768,"height":360,"url":"https:\/\/wmp.mx\/UP1\/wp-content\/uploads\/electromobility.png","type":"image\/png"}],"author":"WMP Mexico Advisors","twitter_card":"summary_large_image","twitter_misc":{"Written by":"WMP Mexico Advisors","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#article","isPartOf":{"@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/"},"author":{"name":"WMP Mexico Advisors","@id":"https:\/\/wmp.mx\/#\/schema\/person\/84796aec27fb6ce4b181b6e6dd4917a2"},"headline":"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure","datePublished":"2018-05-11T14:21:49+00:00","dateModified":"2018-10-17T17:44:57+00:00","mainEntityOfPage":{"@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/"},"wordCount":334,"image":{"@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/wmp.mx\/UP1\/wp-content\/uploads\/electromobility.png","articleSection":["Consulting","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/","url":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/","name":"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure - WMP Mexico Advisors","isPartOf":{"@id":"https:\/\/wmp.mx\/#website"},"primaryImageOfPage":{"@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#primaryimage"},"image":{"@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/wmp.mx\/UP1\/wp-content\/uploads\/electromobility.png","datePublished":"2018-05-11T14:21:49+00:00","dateModified":"2018-10-17T17:44:57+00:00","author":{"@id":"https:\/\/wmp.mx\/#\/schema\/person\/84796aec27fb6ce4b181b6e6dd4917a2"},"breadcrumb":{"@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#primaryimage","url":"https:\/\/wmp.mx\/UP1\/wp-content\/uploads\/electromobility.png","contentUrl":"https:\/\/wmp.mx\/UP1\/wp-content\/uploads\/electromobility.png","width":"768","height":"360","caption":"Electromobility in Mexico"},{"@type":"BreadcrumbList","@id":"https:\/\/wmp.mx\/en\/electromobility-in-mexico-part-3-charging-infrastructure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/wmp.mx\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Electromobility in Mexico \u2013 Part 3: Charging Infrastructure"}]},{"@type":"WebSite","@id":"https:\/\/wmp.mx\/#website","url":"https:\/\/wmp.mx\/","name":"WMP Mexico Advisors","description":"Queretaro | Mexiko Stadt | Puebla | Stuttgart | Greenville","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wmp.mx\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/wmp.mx\/#\/schema\/person\/84796aec27fb6ce4b181b6e6dd4917a2","name":"WMP Mexico Advisors","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/21f9f8c0c3185162b5e65d2092ea016646e997bb1db514746a1fa5a874a66e54?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/21f9f8c0c3185162b5e65d2092ea016646e997bb1db514746a1fa5a874a66e54?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/21f9f8c0c3185162b5e65d2092ea016646e997bb1db514746a1fa5a874a66e54?s=96&d=mm&r=g","caption":"WMP Mexico Advisors"},"description":"WMP Mexico Advisors ist der Partner des Mittelstands in Mexiko. Unser Ziel ist, internationalen Unternehmen beim Aufbau und der Verwaltung ihrer ausl\u00e4ndischen Niederlassung in Mexiko eine Hilfestellung zu bieten.","sameAs":["https:\/\/wmp.mx\/"]}]}},"_links":{"self":[{"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/posts\/1940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/comments?post=1940"}],"version-history":[{"count":0,"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/posts\/1940\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/media\/1944"}],"wp:attachment":[{"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/media?parent=1940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/categories?post=1940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wmp.mx\/en\/wp-json\/wp\/v2\/tags?post=1940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}